Articles in Tags Sunshine board

1. How much is one Square meter in the sun?

The price of the sunrier canopy is available from dozens to hundreds.The price of sunlight plates with different materials is much different. Generally, the price of sunrochemine of the material is 1561 Square meters. Of course, the difference in the material of the material will also be different.The price of PC Sunshine board is not a constant price, but a comprehensive consideration of the technical process level and the performance of the board. At that time, the price and other costs of raw materials and other costs were calculated.

The price of the PC Sunshine board is calculated as follows: 6mm-16mm thickness, and the general price is from 25 yuan to 100 yuan/. The thickness of the thickness of this interval is relatively common.X -shaped, rice type, honeycomb type.The thickness is 16mm-40mm, and the price is generally 80 yuan-2060 yuan/. The PC sunboard with this interval thickness is generally less used, and it is also divided into various shapes.

2. How to install the Sunshine Fragrance

1. First check the skeleton, which must be flat without welding scars and burrs.The skeleton must be completely dry and there must be no volatile solvents.

2. Powder the tan -based waterproof tape on both sides of the skeleton to form a small sink.

3. Place the sunboard on the skeleton, and the telescopic joints are reserved between the board and the plate.

4. Press the EPDM press on the interface between the board and the plate.

5. Fix it with a drilling screw.

6. The skeleton must be used at 1.05m in the middle of the sunboard.

7. The sunlight board on the wall shall not be directly contacted with the wall surface, fix it on the wall with angle aluminum, and then put the sunboard in and install it.

8. The sunblasts are sealing the mouth with aluminum tape first, and then fixing the edge or corner aluminum.

Three, installationSunshine Steakprecautions

1. Check the cutting size of the board and whether the reservation of the bulletin is appropriate. We must pay special attention to leaving enough uniformly swelling gaps. The calculation formula is as follows: Total expansion gap = bulging coefficient*The maximum temperature before and after local installation of local installation*board length.

2. The section of the plate was clamped in the large -scale plate installation engineering must contain at least one tendon rib, or the smallest part of the section of the edge of the board is 20mm.

3. Recognize the surface of the surface of the board, and install the surface out of the outside, and never allow the ultraviolet side to be installed inward.

4. Before installing, the protective film surrounded by the plate is 30mm-50mm. Do not clamp the protective film of the profile, but you should not remove too much, so as not to damage the board due to operation.

5. When the self -attacking nail is tightened, the force should be evenly tightened to ensure that the type plate is truly crushed and densely sealed.

6. In the case of cold bending of hollow plates, its curved radius must not be 175 times the thickness of the analytical material.

7. The hollow plate can only bend the ribs in the direction of the ribs.

8. The tilt installation of hollow plates should be directed to the ribs, which is conducive to the export of condensation water.