Construction curtain wall design and construction building curtain wall engineering standards
1. General Principles
(1) In order to strengthen the management of the construction and construction enterprises in the construction of the Building curtain wall, maintain the order of the construction market, ensure the quality and safety of the project, promote the healthy development of the industry, and formulate this standard in combination with the characteristics of the construction curtain wall project;
(2) The scope of this standard project refers to the construction curtain wall project in various construction projects;
(3) This standard is the basis for approved the corporate qualification level of the construction and construction activities of the Building curtain wall;
(4) This standard has two Levels: first and secondary Levels;
(5) In this standard, engineering performance and professional and technical personnel performance indicators refer to the construction decoration projects that have been completed and accepted the quality of quality.
2. Standard
(1) Level first
1. Corporate credit
(1) Have an independent corporate legal person qualification;
(2) Has a good social reputation and has corresponding economic strength.
(3) In the past five years, there have been no less than 6 construction engineering engineering (design or construction or design) with an area of not less than 6,000 Square meters.
(4) In the past three years, the annual project settlement income is not less than 40 million yuan.
2. Technical conditions
(1) The person in charge of the enterprise has been engaged in the construction curtain wall engineering experience at no less than 8 years.Items
(2) Enterprises have no less than 10 professional and technical personnel engaged in construction curtain wall engineering (the majors they are studying are architectural structures, mechanical categories).Among them, there are no less than 6 people in mechanical majors, no less than 4 people in the construction structure, and have been engaged in the construction curtain wall for more than 3 years, participating in the completion of construction engineering (design or construction with a single Building curtain wall with no less than 3,000 Square metersOr design and construction integration) No less than 1 item;
(3) There are no less than 6 professional and technical personnel who have the qualifications of first -level registered builders (first -level structural engineers and first -level project managers).
3. Technical equipment and management level
(1) The necessary technical equipment and fixed workplace;
(2) It has a complete quality management system and runs well.With technology, security, operation, personnel, finance, archives and other management systems.
(2) Level 2
1. Corporate credit
(1) Have an independent corporate legal person qualification;
(2) Has a good social reputation and has corresponding economic strength.
(3) In the past five years, the enterprise has independently undertaken the construction engineering engineering (design or construction or design and construction of construction engineering (design or construction or design) in the past five years.
(4) Enterprise's annual project settlement income in the past three years is not less than 10 million yuan.
2. Technical conditions
(1) The person in charge of the enterprise has no less than 6 years in the construction curtain wall engineering experience, and has a secondary and above registered builders (structural engineers) practice qualifications or intermediate and above professional technical titleskind);
(2) Enterprises have no less than 5 people engaged in construction curtain wall engineering professional and technical personnel (the majors they have learned are architectural structures, mechanical categories).Among them, there are no less than 3 people in mechanical majors, no less than 2 people in the construction structure, and have been engaged in the construction curtain wall for more than 3 years, participating in the completion of construction engineering (design or construction with a single Building curtain wall area of no less than 3,000 Square meters (design or constructionOr design and construction integration) No less than 1 item;
(3) The enterprise has no less than 5 professional and technical personnel who have the qualifications of registered construction engineers (structural engineers and project managers).
3. Technical equipment and management level
(1) The necessary technical equipment and fixed workplace;
(2) It has a complete quality management system and runs well.With technology, security, operation, personnel, finance, archives and other management systems.
3. Contracting business scope
(1) Enterprises that have obtained the construction and construction qualifications of the construction curtain wall project can engage in the integrated project of consulting, design, construction and design and construction of construction curtain wall projects in various construction projects.Items
(2) Enterprises that obtain first -level qualifications to undertake the scale of the Building curtain wall project are not limited;
(3) Enterprises that obtain secondary qualifications can bear construction projects with a single Building curtain wall of the single building.
Fourth, attachment
(1) Enterprises applying for secondary qualifications to be promoted to first -level qualifications. There should be no violations of laws and regulations in the past two years, no quality and safety responsibility accidents;
(2) Units that have obtained the "Certificate of Building curtain wall engineering design and Construction Qualification Certificate".
(3) Newly established enterprises can only apply for secondary, except for the net assets in "Enterprise Credit" (2) and (3) and (4) without requirements, other conditions should meet the requirements of the secondary qualification standards;
(4) This standard is interpreted by the Ministry of Construction;
(5) This standard will be implemented from September 1, 2006.