1. How to charge the lighting project of the landscape

1. The industrial construction part (office building, corporate headquarters, administrative office building, etc.)

(1) It is charged at 15 yuan/Square meter with less than 5,000 Square meters.

(2) It is charged at 10 yuan/Square meter of 5,000 Square meters to 10,000 Square meters.

(3) At 8 yuan/Square meter of 10,000 Square meters to 30,000 Square meters.

(4) 6 yuan/Square meter from 30,000 Square meters to 50,000 Square meters.

(5) More than 50,000 Square meters of negotiation.

2. The residential part (unique apartment, commercial and residential building, high -rise residential buildings, etc.)

(1) It is charged at 9 yuan/Square meter with less than 5,000 Square meters.

(2) The 5000 Square meters to 10,000 Square meters is charged at 7 yuan/Square meter.

(3) It is charged at 5 yuan/Square meter of 10,000 Square meters to 30,000 Square meters.

(4) Received 3.5 yuan/Square meter from 30,000 Square meters to 50,000 Square meters.

(5) More than 50,000 Square meters of negotiation.

3. Multiple buildings (refer to the corresponding coefficient of the base of the residential part)

(1) When designing the building group, the building of the same facade is below the three buildings (including three buildings). The calculation of the lighting design is: the first building is calculated according to the above standards, and the second and third buildings are separately separated by each other.Based on the first building, it is charged by the 0.8 coefficient.

(2) When designing the building group, the building of the same facade is more than three buildings. The calculation of the lighting design charging is: the first building is calculated according to the above standards, and the second and third buildings are in the first building, respectively.Based on the 0.6 coefficient, it is charged.

(3) When designing the building group, the building of the same facade is below the three buildings (including three buildings), and the calculation of its lighting design charges with a building height of more than 11 floors is: The first building is calculated according to the above standards, and the above standards are calculated, and the above standards are calculated.The second and third buildings are charged by the 0.6 coefficient on the basis of the first building.

4. Commercial spaces such as hotels, clubs and other buildings

(1) It is charged at 15 yuan/Square meter with less than 3,000 Square meters.

(2) It is charged at 12 yuan/Square meter from 3,000 Square meters to 5,000 Square meters.

(3) The 5000 Square meters to 8,000 Square meters is charged at 10 yuan/Square meter.

(4) 8,000 Square meters to 10,000 Square meters of 8 yuan/Square meter.

(5) More than 10,000 Square meters of negotiation.

5. Noble residential garden landscape design

(1) It is charged at 5 yuan/Square meter with less than 3,000 Square meters.

(2) The 5000 Square meters to 10,000 Square meters are charged at 3.5 yuan/Square meter.

(3) More than 30,000 Square meters of 10,000 Square meters of 10,000 Square meters are charged at 3 yuan/Square meter.

(4) Those who negotiate separately above 30,000 Square meters.

2. List of Landscape lighting Project

1. design fee:Including on -site survey fees, design work fees, etc.

2. Main material fee:The main materials required for illuminating projects are various LED lights, power supply, controllers, etc.There are many LED lights, which should be listed according to the number, model and price corresponding to the renderings of the brightening solution, such as specifications, brands, quantities, unit prices and total amounts.How many lamps in the plan must be listed in detail in the quotation form.

3. accessories fee:The cost of paving materials is generally: cable, power distribution box, thread Tube, screw, plug.The auxiliary materials are relatively messy and must be carefully counted.

4. labor cost:Including installation fees, insurance premiums, etc., labor costs can be listed according to different prices required for installation of different lamps, or they can be listed with main materials.

Remarks: The installation fee can be roughly divided into two types of pricing:

(1) Calculate according to the amount of engineering:Number of construction days*Daily workers number*Average labor salary = installation fee.

(2) Calculate according to the number of lamps:The amount of the number of lamps is calculated*multiplied by the installation cost of each lamp = total installation cost.

It should be noted here that the cost of insurance contained in labor costs must be listed.The illumination project is a high -altitude operation.In order to ensure that public and private property is not damaged, it is necessary to pay insurance premiums for each worker and public property in accordance with national regulations.

5. Other expenses:The mechanical costs of cranes, scaffolding, cranes and other engineering vehicles used during the installation process, as well as taxes and fees involved in the later period must also be clearly listed.

The landscape lighting project quotation list is quite expensive. These aspects are only a big aspect. In addition, there are many other small costs. Generally, each of them needs to be recorded.To be in urban lighting, you need to make a budget in advance, and in the process of actual lighting, make a planning layout to make the money cost more value.