How to lay a man -made lawn
1Construction diagram area
First, the area of the lawn is good, and it is priced at per inch.It is best to make a detailed construction area. The same area, the placing is on the drawings, and the algorithms of the corners may be different. With the construction map area, it will be more accurate.
2The color of the lawn
The lawn is green, and the green lawn is also very different, with light green and dark green.And how long the green is used up, the color will become lighter. These must be taken into account the budget. You ca nt change it before it. It is a waste of money.
3The model of the lawn
Then determine the model of the lawn, the model of green grass is very thin and thick.Green grass is vertical, tilted, and so on.Do not order individual preferences, and choose the model according to the actual needs of the lawn.
4The quality of the lawn
The quality of the lawn is the key. It is said that the lawn always falls off and stained on the clothes. It is because the quality of the lawn is not good. The inferior lawn rolled on it and will occur.
5, Acceptance of all accessories
There are also glue and glue of sticky lawn, waiting for some auxiliary materials tools.After everything is ready, the most detailed acceptance work is needed to ensure that each link, each rot is a quality pass, and is flawless, because the lawn rework is a big project and must be meticulous.
6, Start paving the lawn
The best procedure is to start the lawn. Do not spread it, according to the construction drawings, follow the order, first follow oneThe corners of the side began, rolling along.Do not use the paved lawns immediately, wait for it to be completely sticky.In the later period, you should always ask professionals to take care of it.
How to fix the fake lawn to the wall
12. Auxiliary tools that need to be prepared before installation: long ruler, wallpaper knife, artificial garries special glue, brush, rubber hammer, dragon Bone stand, electric diamond, nail, etc.
2Before the construction connection process of artificial lawns, you need to clean the ground or wall of the Artificial lawn to keep the surface dry and water without moisture.5Above C or above is the most suitable for Artificial lawn construction; the lawn stall is openedtwenty fourIn hour, the release of the lawn tension makes the lawn paving effect without wrinkles and more beautiful.
3Fix the dragon Bone stand on the wall first.Draw a small circle with the wall with the wall with a brush in a place where you need nails. Use an electric drill drilling hole to nail on the small circle to fix the dragon skeleton firmly on the wall.
4According to the height of the wall, the lawn is cut into the required size with a wallpaper knife, nails on the dragon skeleton with nails, and brushes the corner of the lawn to avoid cracking.The drying time should be controlled during the brushing process of the Artificial lawn.Generally after applying glue10-30Within minutes, the glue reaches 80 % of the dry, and it is advisable to touch it.The Artificial lawn is required to be aimed at one -time adhesion when the construction bonding. Do not move the adhesive object after the bonding.
5The solidification of the specific construction process of artificial lawns: during the construction of artificial lawns, the curing time is generally three days, and the final strength of the test is generally ten days.Pay attention to the maintenance of Artificial lawn during the construction of Artificial lawn construction, and avoid water immersion and movement by artificial lawns, so that Artificial lawn bonding the best state.
Different from other installations during the installation of the Artificial lawn wall is to support the keel stand. This is also the most important link in the wall installation. Only in this way can we fix the lawn more reliable.