1. What are the qualifications for the construction of the landscape lighting project?

The construction of landscape lighting project requires the qualifications for the professional contracting of urban and road lighting engineering.Projects include: functional lighting of roads and streets; functional lighting in residential areas; functional lighting of Outdoor public space; landscape lighting of structures and buildings; landscape lighting of parks, public green spaces, residential areas; landscape lighting of scenic spots, famous monuments;lighting intelligent centralized monitoring management system; lighting supply system project.

The qualifications for the professional contracting of urban and road lighting engineering are divided into first, second, and third Levels.Qualifications have certain requirements for corporate assets, main personnel, and corporate engineering performance, and the scope of contracting corresponding to different qualification Levels is different.First -level qualificationThe construction of various cities and road lighting can be undertaken.Secondary qualificationThe construction of cities and road lighting projects with a single contract of not more than 12 million yuan can be undertaken.Three -level qualificationThe construction of cities and road lighting projects with a single contract of not more than 6 million yuan can be undertaken.

2. Contents of the construction plan of landscape lighting project

1. The design drawings of the lighting project are explained and explained. For things that do not understand and understand, you should communicate more and coordinate, or make a step -by -step drawing.Essence

2. Make a detailed construction material list, labor type, and Tool list, etc. according to the amount of lighting projects, and create a good reference for the Smooth construction.

3. Materials classify the name, model specifications, and quantity of the lighting equipment required for the lighting project, and the use of the use of the required materials must be marked, and the required materials must be guaranteed.It may be in place to save time.

4. Implement the planning of the construction progress plan of the lighting project. The progress sheet is based on the period of lighting the project, and the workload of the project project, work content, and when the project is completed through scientific and effective arrangements to achieve reasonable allocation of manpower and material resources.Financial resources, the construction task is reached in accordance with the time of acceptance, the schedule of the progress plan also refers to the construction process and the intersection scope of the work that may occur.

5. On -site survey of lighting engineering projects, determine the stacking location of the entrance materials, and the temporary erection of water and electricity facilities, and need to understand the situation of other adjacent construction units, so as not to cause other unpleasantness in the construction, to understand it in a timely manner, and understand it in a timely manner.Communicate and solve it to ensure the Smooth progress of the construction of the lighting project.And when checking the project, compare whether the construction drawing is deviated, so as to make early, solve it early, change early, and early construction.In addition, it is necessary to understand the transportation, material and Tool suppliers around the project, to prevent the urgent need to ignite when there is a shortage of Tool materials.

6. The materials are organized in order to determine the number of materials, the entry time, and delivery time. For the stacking of the materials, it must be organized and cannot be placed arbitrarily to avoid affecting the integrity of the material.The secondary movement occurs the phenomenon of misalignment materials. Due to the particularity of the lighting equipment, it is necessary to choose a relatively high and dry place to avoid damage to the equipment due to rain and snow. The material needs to be used in accordance with the use.It is far from flammable and explosive, and it is necessary to be equipped with fire equipment.That is, the materials used can be placed directly on the working surface to reduce the handling. The tools and materials should be placed separately to prevent damage to the lighting equipment.Register and quantity registration of classification materials to prepare for inspection.

7. Temporary hydropower can be set up, try to use the original line as much as possible, and must comply with relevant provisions and specifications of temporary lines.

8. The personnel divide the layout, divide responsibilities, responsibilities, choose technical, responsible, and experienced personnel to act as the person in charge of the work.This is a good way to avoid the problem of managers who manage everything, and can take out the energy to better coordinate and supervise the progress of the entire lighting project and other affairs.

9. property and personnel insurance at the construction site of the project construction site to avoid unnecessary losses and disputes to the company due to fire, stolen, and injuries.