Articles in Tags top wall decorative material

Introduction to TV Background wall setting rack

The design of the TV wall at home is to make the TV Hanging there, but there are many small Dongxi on the side of the TV, so the TV wall standing rack can be used.Come on the TV, the TV wall stand can allow the space to separate at home.

The installation method of the TV Background wall

1. Preparation tools: wrench, pliers, electric diamonds.

2. Observe the wall.Install the shelf on the solid wall.

3. Horizontal measurement, draw the installation location on the wall.

4. According to the relevant drawings, punch perforation on the planned wall, and then fix it with a nail.

How to choose a rack

1. There are many types of racks. Common ones are glass racks, plastic racks, stainless steel racks, alloy racks and frames.When we choose, we can determine the material based on the occasions and storage capabilities. For example, the kitchen is suitable for the use of alloys, and the bathroom can be used to set up glass racks. The living room and I use the shelves to be beautifully set and the assembly is simple.

2. When buying the rack, pay attention to whether the bearing gravity is good. If the hung heavy object will cause the deformation of the shelf, this must be considered, because the root of the rack is the load -bearing storage, so we are buying it.Time also needs to be purchased according to the actual weight of your own storage.

3. When purchasing the storage racks used in a special top environment, it also depends on moisture -proof and rust and anti -rust and anti -rust.Of course, it is also important to clean it.

4. Regardless of the material of the material, we must keep the surface clean. We can often wipe it with soft cotton cloth and water.The solution, otherwise it will be corroded by the shelf, affecting the service life.

maintenance method of setting racks

1. If you want to extend the service life of the rack, daily cleaning is essential.For the dust and dirt on the surface, you can wipe it with water with a rag, and it is best to wipe the rags before rubbing, so as not to leave the water stain on the shelf, which will affect the service life of the material.

2. Usually it is best to wipe the rack with a soft towel. If you encounter more stubborn stains, you can use some cleaner appropriately, but you cannot use an acidic cleaner, otherwise it will damage the material of the product, which will cause it to deformed, cracking and other phenomena.Essence

3. When cleaning the rack, avoid removal of the cleaner on the surface. Long time will affect its surface quality and affect its gloss.So every time you clean, wipe it with a rag.

4. For the stubborn dirt that is difficult to remove, the simple wipe is incomplete, so you can use a cleaner to remove the dirt, but you must pay attention to the use of mild products to avoid damage to the material of the product, and it is best to use softness.Wipe the cotton cloth clean.

5. You can use a clean rag to completely clean the entire product, but you do nt need to clean it frequently. It can be cleaned every three months to extend the service life of the shelf and let it better serve us.

The most practical TV Background wall setting up

Honeycomb wall setting rack

When it comes to the wall standing rack, in fact, the first thing friends are considered the aesthetics of the shape of the wall shelf, so here to recommend a more fashionable wall -faced shelf shape for everyone.The design of the shelf is generally suitable for owners with small living rooms like this.The honeycomb display board is a classic combination of black and white. It mainly places some artworks. The main feature of this panel is the strong artistic atmosphere. Not only can it be placed in the honeycomb, but there can be many artworks on the honeycomb.Essence

Geometric pattern wall setting rack

If there are children in the family and the toys that are losing the ground and on the bed, the mothers must be very troublesome, then at this time, we might as well DIY a wall stand to use these toys to use these toys to decorate the decorations of the children to decorate the decorationThe wall, this can also give the child a just growing environment.

Personal creative wall setting rack

It is precisely because friends are no longer novel about the wall sets in the window, so they have the idea of their own DIY wall sets of racks.Some friends who like personality and creativity can give full play to their imagination at this time, and use some special materials as possible.

Geometric stainless steel wall surface

Regarding the choice of wall -faced racks, in fact, the shape is only one role that affects its decoration. In many cases, because the material of the wall of the wall is different, the style is also very different.It is simple geometric. Because stainless steel is made of stainless steel, it will be very rigid and textured when the wall is matched.

1. General Principles

(1) In order to strengthen the management of the construction and construction enterprises in the construction of the Building curtain wall, maintain the order of the construction market, ensure the quality and safety of the project, promote the healthy development of the industry, and formulate this standard in combination with the characteristics of the construction curtain wall project;

(2) The scope of this standard project refers to the construction curtain wall project in various construction projects;

(3) This standard is the basis for approved the corporate qualification level of the construction and construction activities of the Building curtain wall;

(4) This standard has two Levels: first and secondary Levels;

(5) In this standard, engineering performance and professional and technical personnel performance indicators refer to the construction decoration projects that have been completed and accepted the quality of quality.

2. Standard

(1) Level first

1. Corporate credit

(1) Have an independent corporate legal person qualification;

(2) Has a good social reputation and has corresponding economic strength.

(3) In the past five years, there have been no less than 6 construction engineering engineering (design or construction or design) with an area of not less than 6,000 Square meters.

(4) In the past three years, the annual project settlement income is not less than 40 million yuan.

2. Technical conditions

(1) The person in charge of the enterprise has been engaged in the construction curtain wall engineering experience at no less than 8 years.Items

(2) Enterprises have no less than 10 professional and technical personnel engaged in construction curtain wall engineering (the majors they are studying are architectural structures, mechanical categories).Among them, there are no less than 6 people in mechanical majors, no less than 4 people in the construction structure, and have been engaged in the construction curtain wall for more than 3 years, participating in the completion of construction engineering (design or construction with a single Building curtain wall with no less than 3,000 Square metersOr design and construction integration) No less than 1 item;

(3) There are no less than 6 professional and technical personnel who have the qualifications of first -level registered builders (first -level structural engineers and first -level project managers).

3. Technical equipment and management level

(1) The necessary technical equipment and fixed workplace;

(2) It has a complete quality management system and runs well.With technology, security, operation, personnel, finance, archives and other management systems.

(2) Level 2

1. Corporate credit

(1) Have an independent corporate legal person qualification;

(2) Has a good social reputation and has corresponding economic strength.

(3) In the past five years, the enterprise has independently undertaken the construction engineering engineering (design or construction or design and construction of construction engineering (design or construction or design) in the past five years.

(4) Enterprise's annual project settlement income in the past three years is not less than 10 million yuan.

2. Technical conditions

(1) The person in charge of the enterprise has no less than 6 years in the construction curtain wall engineering experience, and has a secondary and above registered builders (structural engineers) practice qualifications or intermediate and above professional technical titleskind);

(2) Enterprises have no less than 5 people engaged in construction curtain wall engineering professional and technical personnel (the majors they have learned are architectural structures, mechanical categories).Among them, there are no less than 3 people in mechanical majors, no less than 2 people in the construction structure, and have been engaged in the construction curtain wall for more than 3 years, participating in the completion of construction engineering (design or construction with a single Building curtain wall area of no less than 3,000 Square meters (design or constructionOr design and construction integration) No less than 1 item;

(3) The enterprise has no less than 5 professional and technical personnel who have the qualifications of registered construction engineers (structural engineers and project managers).

3. Technical equipment and management level

(1) The necessary technical equipment and fixed workplace;

(2) It has a complete quality management system and runs well.With technology, security, operation, personnel, finance, archives and other management systems.

3. Contracting business scope

(1) Enterprises that have obtained the construction and construction qualifications of the construction curtain wall project can engage in the integrated project of consulting, design, construction and design and construction of construction curtain wall projects in various construction projects.Items

(2) Enterprises that obtain first -level qualifications to undertake the scale of the Building curtain wall project are not limited;

(3) Enterprises that obtain secondary qualifications can bear construction projects with a single Building curtain wall of the single building.

Fourth, attachment

(1) Enterprises applying for secondary qualifications to be promoted to first -level qualifications. There should be no violations of laws and regulations in the past two years, no quality and safety responsibility accidents;

(2) Units that have obtained the "Certificate of Building curtain wall engineering design and Construction Qualification Certificate".

(3) Newly established enterprises can only apply for secondary, except for the net assets in "Enterprise Credit" (2) and (3) and (4) without requirements, other conditions should meet the requirements of the secondary qualification standards;

(4) This standard is interpreted by the Ministry of Construction;

(5) This standard will be implemented from September 1, 2006.