How to install the LED light zone

In fact, the installation and use of the LED Light belt are very convenient, and you can make a very beautiful effect by yourself.Let me talk about the main installation and use of the LED light band.

1. Interior installation: When the LED Light belt is used for indoor decoration, it is very simple to install because it does not need to be hit with wind and rain.Taking the brand's LED light zone as an example, the self -viscosity 3M double -sided glue is affixed behind the LED lamp Belt. You can directly remove the sticker on the surface of the 3M double -sided glue surface during installation, and then fix the light bar on the need for installation.Local, just press flat with your hands.What should I do if some places need to be turned or grow?It is very simple. The LED Light belt is a circuit structure composed of 3 LEDs as a series of co -connected methods. Each LED can be cut and used separately.

2. Outdoor installation: LED lamp band Outdoor installation will withstand the wind and rain. If it is fixed with 3M glue, it will cause 3M adhesive to reduce the LED Light belt off.The method of cutting and connection is required. The method is the same as the indoor installation. It only needs to be equipped with waterproofing to consolidate the waterproof effect of the connection point.

3. Pay attention to the connection distance of the LED Light belt: Generally speaking, the 3528 series LED Light belt, its connection distance is up to 20 meters, the 5050 series LED Light belt, the longest connection distance is 15 meters.If this connection distance is exceeded, the LED Light belt is easy to heat, and it will affect the service life of the LED light zone during use.Therefore, when installing, be sure to install it according to the requirements of the manufacturer, and avoid letting LED lights run over the load.

Whether the LED Light belt is installed and used is very simple.However, there is still a friendly reminder: when installing the Light belt, you must pay attention to the safety of the electricity, and you can do it when the power is disconnected.

LED Light belt installation illustration

Step of lamp band installation method

1. Perform the corresponding length tailoring.Generally, the Lights we buy directly are good. This is that we need to cut correlation length according to the actual use of our actual use. When tailoring, pay attention to cutting according to the termination point.

2. After the length of the lamp Belt is carried out, we insert the thread needle of the lamp band into the place where there is no patch at one end of the lamp.

3. Connect the thread needle with the plug of the lamp Belt. At this time, you can power on the plug, but at this time, we need to pay attention to the situation that we need to check the access point again before inserting. There must be no water stains.

4. After plugging in, if the light band is shining normally, on the one hand, it shows that our installation steps are correct, and on the other hand, it also shows that there is no problem with the lamp Belt itself.

precautions for installation of LED light

1. When the entire roll lamp strap is not disassembled away from the packaging or piled into a ball, do not light up to light up the LED light band.

2. When cutting the lamp Belt according to the on -site installation length, you can only cut the light band at the printed scissors mark, otherwise one of the units will not be bright, and the length of each unit is 1.5-2 meters.

3. When connecting the power supply or two -section Lights, first bent the head of the lamp to the left and right, so that the wire in the lamp Belt is about 2-3mm.Take it to avoid short circuits.

4. Only the same specifications and the same voltage of the color lamp band can connect each other, and the total length of the connection cannot exceed the maximum permitted length.

5. When the lamp band is connected in series, each connection is connected, that is, the pilot is on, so that the positive and negative electrodes can be inconsistent with the light of the light of each lamp band in time.

6. The end of the lamp Belt must be put on the PVC tail. After tightening with a strap, then seal the interface with a neutral glass glue to ensure safety.

7. Because the LED has one -way conductivity, if the power cord with a passing DC converter is used, the power supply can be performed first after completing the power supply connection to determine the positive and negative pole connection before putting it into use.

Disclaimer: The above method stems from the index of the program system or the sharing of netizens. It is for your reference only and does not represent the research perspective of this website. It proves that it is effective. Please pay attention to the authenticity and authority of the source of the content of the content.Apply to delete & gt; & gt;Correction & gt; & gt;